Work Center Planning in MRS PDF Print E-mail
User Rating: / 10
PoorBest 
MRS (Multi Resource Scheduling) - MRS Video Tutorials
Written by Varun   
Saturday, 27 March 2010 19:26

It is also possible to do work center planning (also referred as rough cut scheduling) in MRS. This function is available since MRS 610 SP03 release.

The important functions of MRS rough cut scheduling are:

  • Visualize the capacity (utilization) at the work center level
  • Drag and drop operations to schedule them
  • Undo-Redo function available - Simulate your results and finally save them
  • Drag and Drop dispatching at resource level (create assignments)

In order to use this function, you must first transfer the work center to MRS. This is done by executing the report: /MRSS/SGE_PN_MNT.

The below attached video shows how rough cut scheduling is done in MRS

 

',width:'100',height:'100'" width="100" height="100" align="" />

 

Comments
Add New Search
Write comment
Name:
Email:
 
Title:
UBBCode:
[b] [i] [u] [url] [quote] [code] [img] 
 
 
:angry::0:confused::cheer:B):evil::silly::dry::lol::kiss::D:pinch:
:(:shock::X:side::):P:unsure::woohoo::huh::whistle:;):s
:!::?::idea::arrow:
 
Please input the anti-spam code that you can read in the image.

3.26 Copyright (C) 2008 Compojoom.com / Copyright (C) 2007 Alain Georgette / Copyright (C) 2006 Frantisek Hliva. All rights reserved."

Last Updated ( Saturday, 27 March 2010 20:33 )
 

Advertisement

 

Google Search

Advertisement